Construction Takeoff & Estimating Portfolio

Browse sample markup plans and Excel worksheets across our core estimating trades.

Color-Coded PDF Markups

Every drawing sheet is marked up digitally to show exactly what materials were measured, making verification easy.

Detailed Excel Spreadsheets

You receive organized, formula-supported spreadsheets sorted by trade scope and CSI division, ready to copy into your bids.

Concrete foundation and structural framework representing Takeofix's commercial and residential concrete estimating services.

Concrete

Exterior site concrete and paving work, demonstrating our site concrete quantity takeoff capabilities.

Site Concrete

Brick and block masonry construction, highlighting Takeofix's detailed masonry estimating and material takeoffs.

Masonry

Exterior building envelope showing roofing and siding materials for contractor bidding estimates.

Roofing and Siding

Commercial landscaping and irrigation layout used for earthwork and exterior takeoff services.

Landscape

Interior metal framing and drywall sheathing installation for interior finishing estimates.

Drywall

Have an Upcoming Bid?

Send us your drawings or link to the project today. We will review the plans and return a fixed-price proposal showing estimated hours, total cost, and turnaround time.

Get a Free Quote
Proven Track Record

Featured Project Case Studies

Explore real-world examples of how our accurate quantity takeoffs and fast turnaround help contractors win tenders and maximize profitability.

Multi-Family Apartment Complex

$4.2M
Dallas, TXDrywall and Framing Takeoff
Scope of Work

Complete quantity takeoff for interior and exterior metal framing, drywall, insulation, and acoustic ceilings across 250 units.

Deliverable & Result

Delivered within 72 hours, allowing the subcontractor to submit a highly competitive bid and secure the contract without adding in-house estimating overhead.

"Takeofix nailed the framing and sheetrock quantities. Their Bluebeam markups made it incredibly easy for our PMs to verify the scope before bid day."

Regional Healthcare Facility

$8.5M
Atlanta, GAMEP Rough-in and Drywall
Scope of Work

Detailed CSI MasterFormat Div 09 finishes takeoff alongside complex MEP routing and rough-in quantification based on strict IBC standards.

Deliverable & Result

Provided highly accurate counts in imperial units, helping the GC identify missing scope in the architectural drawings and issue timely RFIs.

"The precision on the drywall and MEP takeoffs was outstanding. They caught details our in-house team missed, saving us thousands in potential change orders."

Commercial Retail Strip

$1.8M
Phoenix, AZStucco and Siding Takeoff
Scope of Work

Comprehensive exterior envelope takeoff including EIFS, traditional stucco, fiber cement siding, and architectural trim.

Deliverable & Result

Overnight turnaround provided the client with exact square footages for material ordering, minimizing waste factor and reducing overall material costs.

"We needed the stucco and siding numbers fast. Takeofix delivered perfectly organized Excel sheets the very next morning. A lifesaver for our Arizona projects."

High-Rise Condo Development

$4.2M CAD
Toronto, ONDrywall and Framing
Scope of Work

Comprehensive quantity takeoff for interior steel stud framing, drywall installation, taping, and acoustic insulation across 45 residential floors and 3 levels of underground parking.

Deliverable & Result

Delivered in 4 business days. The precise metric and imperial material counts allowed the contractor to lock in material pricing early, avoiding supplier increases.

"Takeofix provided incredibly detailed markups. Their understanding of the OBC fire rating requirements for the drywall assemblies was spot on."

Industrial Logistics Hub

$12.5M CAD
Calgary, ABConcrete and Structural Steel
Scope of Work

Detailed estimation for heavy concrete flatwork, grade beams, foundation walls, and structural steel framing, factoring in deep frost line requirements for Alberta winters.

Deliverable & Result

Overnight turnaround on plan revisions helped the GC secure the winning bid. Concrete volumes (m³) were highly accurate, minimizing waste on site.

"The speed and accuracy of their concrete takeoff gave us the confidence to bid aggressively. They understood the local structural requirements perfectly."

Mixed-Use Residential Complex

$2.8M CAD
Vancouver, BCSiding and Roofing
Scope of Work

Exterior envelope takeoff including fibre cement siding, metal cladding, SBS modified bitumen roofing, and extensive rainscreen details compliant with BCBC.

Deliverable & Result

The colour-coded Bluebeam markups clearly delineated complex building elevations, ensuring all siding accessories and flashings were accounted for.

"Vancouver's rainscreen requirements can be tricky to estimate, but Takeofix nailed the details. Their Excel sheets plugged right into our pricing templates."

Commercial Office Refurbishment

£1.2M
London, EnglandDrylining & M&E Services
Scope of Work

Full quantification of plasterboard, metal stud partitions, suspended ceilings, and preliminary M&E routing for a 5-storey office fit-out.

Deliverable & Result

Delivered a comprehensive BOQ and colour-coded markups within 48 hours, enabling the subcontractor to secure the tender against tight deadlines.

"Takeofix provided exceptional detail on the drylining scope. Their turnaround time meant we could price the preliminaries and measured works with absolute confidence."

Student Accommodation Block

£3.5M
Manchester, EnglandGroundworks & Structural Concrete
Scope of Work

Detailed takeoff of pile caps, ground beams, reinforced concrete slabs, and retaining walls, quantified in metric units (m³ and tonnes).

Deliverable & Result

Provided an RICS NRM 2 compliant takeoff that highlighted discrepancies in the initial tender documents, saving the main contractor significant potential losses.

"The accuracy of their rebar and concrete quantities is unmatched. They flagged a major omission in the engineer's schedule before we submitted our bid."

Retail Park Development

£850k
Birmingham, EnglandCladding & Roofing
Scope of Work

Measurement of composite roof panels, rainscreen cladding, flashing, and rainwater goods for three large retail units.

Deliverable & Result

Produced highly accurate material counts that reduced on-site waste by 8%, directly improving the specialist contractor's profit margin.

"Spot-on measurements for the cladding. The colour-coded plans made it incredibly easy for our site team to organise the material call-offs."

Residential Apartment Complex

$4.2M AUD
Melbourne, VICPlasterboard and Cladding
Scope of Work

Comprehensive quantity takeoff for interior plasterboard walls, suspended ceilings, and exterior architectural cladding for a 6-storey residential development. Compliant with NCC Section F fire resistance requirements.

Deliverable & Result

Delivered within 72 hours, enabling the subcontractor to submit a highly competitive tender and secure the project ahead of three other bidders.

"Takeofix provided incredibly detailed markups. Their understanding of Australian plasterboard standards saved us days of measuring."

Industrial Warehouse Facility

$2.8M AUD
Brisbane, QLDConcrete and Reinforcement
Scope of Work

Detailed takeoff for tilt-up concrete panels, groundslabs, and reinforcement (reo) scheduling for a 5,000m2 industrial warehouse, referencing AS 3600 structural requirements.

Deliverable & Result

Provided accurate concrete volumes (m3) and reo tonnages, allowing the builder to lock in material pricing with local QLD suppliers before market movements.

"The precision on the reinforcement takeoff was spot on. They understood AS 3600 requirements and the reo scheduling was perfect."

Commercial Office Fitout

$1.5M AUD
Perth, WAPlasterboard and Suspended Ceilings
Scope of Work

Interior fitout takeoff including metal framing, plasterboard, acoustic ceilings, and door hardware for a premium Perth CBD office, with all quantities in metric units (m2, lin.m).

Deliverable & Result

Fast overnight turnaround allowed the fitout contractor to meet a strict 48-hour tender deadline imposed by the head contractor.

"We sent the plans Friday afternoon and had the full Excel BOQ by Monday morning. Fantastic service for WA builders on tight tender timelines."